Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie

Particulars of the wind farm

The Ten noorden van de Waddeneilanden wind farm zone lies 67 kilometres from the coast, to the north of Groningen, adjacent to the border with Germany. So it is a long way from the mainland and is hardly visible from the coast. Also to be found within this wind farm zone are the existing Gemini Buitengaats and Gemini ZeeEnergie wind farms, with a joint capacity of 600 MW.

Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and Zee-Energie

Location: Off the coast of Groningen

Ten noorden van de Waddeneilanden Gemini Buitengaats en ZeeEnergie

In use since

2026

2017

In use utill

2056

2027

Number of wind turbines

Still unknown

150

Turbine output (MW)

Still unknown

4

Wind farm output (MW)

700

600

Surface area(km2)

120

70

Operators

TBA

Northland Power

Sites

The wind farm zone, which is yet to be built, will have a single site with a capacity of 700 MW.  The draft Range and Detail Memorandum has been published and has been available for inspection. Documents are available for inspection on the website of Bureau energieprojecten.

At the end of 2021, the Ministry of Economic Affairs and Climate decided to combine the landing procedure for  wind farm Ten Noorden van de Waddeneilanden with that of the new 5-east (4 GW) wind energy zone. This will be done in one spatial program under the Environment Act. A new planning decision will follow in 2024. See also Net op Zee Ten noorden van de Waddeneilanden.

You can find all reports and decisions on the website of RVO Bureau energieprojecten. Here, you will find documents such as:

  • the Range and Detail Memorandum (NRD);
  • the Environmental Impact Report;
  • the site decisions.

Free passage

Through shipping will not be permitted to pass through the Gemini wind farms or Ten noorden van de Waddeneilanden wind farm. Shipping may solely pass through a so-called ‘transit passage’. The open space between the two Gemini wind farms will be used for this.

Shared use

An Area Passport guide will be available on the opening of the Ten noorden van de Waddeneilanden wind farm zone. Zoning in this area passport will show where there is space in the wind farm for shared use.


Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie

Legend Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie:

  • Kavel = Site
  • Vermogen = Output
  • Exploitatie = Operation
  • Vergunninghouder = Permit holder
  • Dit gebied ligt vanaf 67 km uit de kust  = This zone lies from 67 km off the coastline
  • Bestaande windparken = Existing wind farms
  • Toekomstige windparken = Future wind farms