Ga naar de inhoud
beeldmerk-RijksoverheidRijkswaterstaatMinistery of Infrastructure and Water Management
Direct naar
  • About Noordzeeloket
  • FAQ
  • Dutch
  • Sitemap
Noordzeeloket
  • Home
  • News
  • Policy
  • Functions and use
  • Management
  • Network
  • Publications
  • Up-to-date Atlas
  • About Noordzeeloket
  • FAQ
  • Dutch
  • Sitemap
  1. Home ›
  2. Functions and use ›
  3. Offshore wind energy ›
  4. Free passage and shared use ›
  5. Offshore wind farm Egmond aan Zee (OWEZ)

Offshore wind farm Egmond aan Zee (OWEZ)

Particulars of the wind farm

Offshore Wind Farm Egmond aan Zee was the first wind farm to be built in the Dutch section of the North Sea. It is also the smallest wind farm. The 36 wind turbines can be seen from the coast when conditions are clear. The wind farm was commissioned in 2007. The electricity is brought to land near Wijk aan Zee by a transmission cable and, from there, distributed to the national high voltage network.

OFFSHORE WInd farm EGMOND AAN ZEE (OWEZ)
Location Off the coast of North Holland

In use since

2007

In use untill

2027

Number of wind turbines

36

Turbine output (MW)

3

Wind farm output

108

Surface area (km2)

27 km2

Operator

NoordzeeWind

Free passage

The Egmond aan Zee Offshore Wind Farm is solely accessible for vessels with a length of up to 24 metres under strict conditions. The code of conduct (pdf, 180 kB) for safe passage through wind farms specifies the rules and safety tips for vessels passing through this wind farm.

Shared use

It is possible to fish using a fishing rod in Egmond aan Zee Offshore Wind Farm.

Decision-making on opening of Egmond aan Zee Offshore Wind Farm

The opening of Egmond aan Zee Offshore Wind Farm to through shipping forms part of the National Water Plan 2016 – 2021. The Minister of the Interior and Kingdom Relations notified the Lower House of the Dutch parliament in a letter dated 14 March 2018 about the opening of Egmond aan Zee Offshore Wind Farm on 1 May 2018 to through shipping.

Requirements

In order to make the opening of the wind farm possible, the policy guideline contained conditions which wind farms must adhere to. The policy guideline (Government Gazette 2018-22588) applies on the basis of article 6.10 of the Water Act: setting up safety zones around wind farms in the Dutch territorial sea and the Dutch exclusive economic zone. The general policy guideline forms the basis for the Administrative Ruling of General Application (B.A.S.) for each individual wind farm.

The decision can be retrieved here.

B.A.S. Offshore Windpark Egmond aan Zee (stcrt-2018-23769)


Wind energy areas and wind farms

Wind energy areas and wind farms
  • Offshore wind farm Egmond aan Zee (OWEZ)
  • Borssele wind farm zone
  • Hollandse Kust (zuid) Wind Farm Zone including Offshore Wind Farm Luchterduinen (LUD)
  • Hollandse Kust (noord) wind farm zone including Prinses Amalia Wind Farm (PAWF)
  • Hollandse Kust (west) wind farm zone
  • IJmuiden Ver Wind Farm Zone
  • Nederwiek
  • Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie
  • Doordewind
Navigatie
  • Energy transition in the North Sea
  • Preparatory work for wind farms
  • Offshore Grid
  • Inspection and enforcement
  • Free passage and shared use
  • Ecology
  • Start/Stop
  • International
  • Data collection in the North Sea
  • Shipping safety around offshore wind farms (MOSWOZ)
  • Laws and regulations, international treaties and policy
  • Sources
Share this
  • Delen op Facebook
  • Delen op LinkedIn
  • Delen op X

footer-afzender

About Noordzeeloket

This is Noordzeeloket. The fastest way to government information on the North Sea. On how the central government manages the North Sea, and how the space in the North Sea is divided. On what is possible and allowed in the North Sea and what rules and conditions apply. On where to go for which permit. On what national and international policy is in force.

Read more

Go directly to

  • Cookies
  • Privacy statement
  • Copyright
  • Archive

Contact

Please contact us with any questions or comments you may have.

Contact