Ga naar de inhoud
beeldmerk-RijksoverheidRijkswaterstaatMinistery of Infrastructure and Water Management
Direct naar
  • About Noordzeeloket
  • FAQ
  • Dutch
  • Sitemap
Noordzeeloket
  • Home
  • News
  • Policy
  • Functions and use
  • Management
  • Network
  • Publications
  • Up-to-date Atlas
  • About Noordzeeloket
  • FAQ
  • Dutch
  • Sitemap
  1. Home ›
  2. Functions and use ›
  3. Offshore wind energy ›
  4. Free passage and shared use ›
  5. Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie

Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie

Particulars of the wind farm

The Ten noorden van de Waddeneilanden wind farm zone lies 67 kilometres from the coast, to the north of Groningen, adjacent to the border with Germany. So it is a long way from the mainland and is hardly visible from the coast. Also to be found within this wind farm zone are the existing Gemini Buitengaats and Gemini ZeeEnergie wind farms, with a joint capacity of 600 MW.

Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and Zee-Energie

Location: Off the coast of Groningen

Ten noorden van de Waddeneilanden Gemini Buitengaats en ZeeEnergie

In use from

2031

2017

In use utill

Still unknown

2027

Number of wind turbines

Still unknown

150

Turbine output (MW)

Still unknown

4

Wind farm output (MW)

700

600

Surface area(km2)

120

70

Operators

TBA

Northland Power

Sites

The wind farm zone, which is yet to be built, will have a single site with a capacity of 700 MW.  The tender procedure will take place in 2027. The wind farm will supply electricity from 2031 onwards.

The draft Range and Detail Memorandum has been published and has been available for inspection. Documents are available for inspection on the website of Bureau Energieprojecten.

At the end of 2021, the Ministry of Economic Affairs and Climate decided to combine the landing procedure for  wind farm Ten Noorden van de Waddeneilanden with that of the new 5-east (4 GW) wind energy zone. This will be done in one spatial program under the Environment Act. See also Net op Zee Ten noorden van de Waddeneilanden.

You can find all reports and decisions on the website of RVO Bureau energieprojecten. Here, you will find documents such as:

  • the Range and Detail Memorandum (NRD);
  • the Environmental Impact Report;
  • the site decisions.

Free passage

Through shipping will not be permitted to pass through the Gemini wind farms or Ten noorden van de Waddeneilanden wind farm. Shipping may solely pass through a so-called ‘transit passage’. The open space between the two Gemini wind farms will be used for this.

Shared use

An Area Passport guide will be available on the opening of the Ten noorden van de Waddeneilanden wind farm zone. Zoning in this area passport will show where there is space in the wind farm for shared use.


Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie

WOZ_Kaarten_Windenergiegebieden_Website_Februari_2025_v16_TNWClick to enlarge (afbeelding: Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie)

Legend Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie:

  • Kavel = Site
  • Vermogen = Output
  • Exploitatie = Operation
  • Vergunninghouder = Permit holder
  • Dit gebied ligt vanaf 67 km uit de kust  = This zone lies from 67 km off the coastline
  • Bestaande windparken = Existing wind farms
  • Toekomstige windparken = Future wind farms

Wind energy areas and Windfarms

Wind energy areas and Windfarms
  • Offshore wind farm Egmond aan Zee (OWEZ)
  • Borssele wind farm zone
  • Hollandse Kust (zuid) Wind Farm Zone including Offshore Wind Farm Luchterduinen (LUD)
  • Hollandse Kust (noord) wind farm zone including Prinses Amalia Wind Farm (PAWF)
  • Hollandse Kust (west) wind farm zone
  • IJmuiden Ver Wind Farm Zone
  • Nederwiek
  • Ten noorden van de Waddeneilanden, including Gemini wind farms Buitengaats and ZeeEnergie
  • Doordewind
Navigatie
  • Energy transition in the North Sea
  • Preparatory work for wind farms
  • Offshore Grid
  • Inspection and enforcement
  • Free passage and shared use
  • Ecology
  • Start/Stop
  • International
  • Data collection in the North Sea
  • Shipping safety around offshore wind farms (MOSWOZ)
  • Laws and regulations, international treaties and policy
  • Sources
Share this
  • Delen op Facebook
  • Delen op LinkedIn
  • Delen op X

footer-afzender

About Noordzeeloket

This is Noordzeeloket. The fastest way to government information on the North Sea. On how the central government manages the North Sea, and how the space in the North Sea is divided. On what is possible and allowed in the North Sea and what rules and conditions apply. On where to go for which permit. On what national and international policy is in force.

Read more

Go directly to

  • Cookies
  • Privacy statement
  • Copyright
  • Archive

Contact

Please contact us with any questions or comments you may have.

Contact